Electrical System Planning On Ship 54.18 Tone with Biro Klasifikasi Indonesia (BKI) Standard
Abstract
Electrical installation systems is the most important system in the ship, Therefore the planning such as the selection of the electrical components to be installed, installation drawings and calculations must be done carefully and refers to the regulation as standard in the construction of a ship. At 54.18 Tone ship project planning is done in a way that the selection of components is technically adapted to the technical standards of the amount of electricity that is allowed. The technical standard uses BKI code. The planning is done well, but the operating system ships were affected by the power source would be optimal. However, it received less attention from the owner of the shipyard that will build a ship